Case Studies

Assessment of Risk (Local Authority Site)

Assessment of Risk (Local Authority Site)

Since launching in November 2016, Ambisense has carried out approximately 30 projects using the GasfluX technology platform. Here is the second from our Case Study series: Assessment of Risk (Local Authority Site), EPG & Enitial, December 2016

The site was a former sandstone quarry and subsequently a domestic landfill site in the 1980s. Capped in topsoil in 1994, gas was found to be migrating out of the site through the surrounding ground in 2005. A comprehensive gas management system was since installed to extract and flare the landfill gas. Consideration is now being given to permanently shutting down the active gas controls and replacing them with a passive system. Complete continuous monitoring data was collected to inform the decision-making process.

GasfluX™ Deployment

3x GasfluX™ units deployed onsite measuring bulk gases and flow rates over a 2-month period. Half-way through the project, the gas control system was switched off to understand the potential impact of doing this on a permanent basis.

Customer Benefits

When the gas control system was switched off, this was found to have a marginal effect on the gas migration around the site, proving that switching it off would have no major impact on the site.

Look at the graphs, the methane concentration shows that there is a correlation with atmospheric pressure. This could suggest that methane emissions increase in low atmospheric pressure. However, the GSV graph shows no significant correlation that would affect risk and therefore no increased emissions in low atm pressure. This allows the consultants to conclude that, on this site, time-series data of concentration alone (i.e. without measuring flow) can be misleading.

Fig.1 Time Series of CH4 and GSV (source: EPG ltd)

You may also like

Continuous Monitoring of Groundwater Level Providing Real Time Water Level Data

Our Services Continuous Water Level Monitoring Instrumentation and Telemetry. Real-time Water Level Data 24/7 Ambilytics: Data Analytics Challenge Ambisense are currently assisting our client with their[...]

Using Analytics, Geotechnical Data & Continuous Monitoring of Ground Gas on a

Our Services Continuous Gas Monitoring Geotechnical Data Assessment Ambilytics: Data Analytics Challenge Ambisense was commissioned to monitor and assess the construction of a trial embankment on[...]

Closed landfills: Maximising LFG capture, Minimising Risk

Since launching in November 2016, AmbiSense has carried out approximately 40 projects using the GasfluX technology platform. Here is another from our Case Study series: Closed landfills: Maximising[...]